£9,000 Boiler Upgrade Scheme Grant: Oil & LPG Deadline

£9,000 Heat Pump Grant for Oil or LPG Boiler Replacements: Don't Miss the Deadline

Mitsubishi Ecodan installed through Alto Energy

If you're heating your home with oil or LPG and thinking about switching to a heat pump, now is the time to act.

The government is currently offering eligible homeowners a £9,000 Boiler Upgrade Scheme (BUS) grant when replacing an oil or LPG heating system with an air source or ground source heat pump.

But this increased grant won't be around for much longer.

The £1,500 uplift is due to end on 31 March 2027, meaning the grant will return to £7,500 from 1 April 2027.

Importantly, it's not enough to simply submit your application before the deadline. Your BUS voucher must be approved by Ofgem by 31 March 2027, and your installation must be completed within 90 days of approval.

With the deadline approaching, leaving things until the last minute could mean missing out on the additional £1,500.

Important Deadlines You Need to Know

There are two important deadlines to understand if you want to benefit from the full £9,000 grant.

31 March 2027: Your voucher must be approved

To qualify for the £9,000 grant, your BUS voucher must be approved by Ofgem no later than 31 March 2027.

Simply submitting an application before this date isn't enough. It needs to have been approved.

This is why it's important to start the process early. The sooner you get your property assessed, place your order and begin preparing your application, the more time there is to get everything in place.

Within 90 days of approval: Your installation must be completed

Getting your voucher approved is only part of the process.

Once approved, you have 90 days to complete your heat pump installation. This means your heat pump must be fully installed and commissioned by one of our engineers, with all heat emitters fitted, so that we can redeem your voucher.

What happens if you miss the 90-day deadline?

If your installation cannot be completed within the 90-day period and we cannot redeem your voucher, we'll need to submit a new application.

However, as the £9,000 uplift will have ended, any new voucher would only be for the standard £7,500 grant.

An example of how the deadlines work

Let's say your £9,000 voucher is approved on 5 March 2027.

You then have until 3 June 2027 to complete the installation, have it fully commissioned by Alto Energy and have the voucher redeemed. If the deadline is missed and a new application is needed, you would only be eligible for the standard £7,500 grant.

The important thing to remember is that your voucher must be approved before 31 March 2027, and your installation must be completed within its 90-day validity period.

Mitsubishi R32 Ecodan installed through Alto Energy

Don't Leave Your BUS Application to Chance

At Alto Energy, we understand how important it is to get your application right, particularly with the uplift coming to an end.

We recently received feedback from Ofgem telling us that our applications are some of the most comprehensive and complete they receive, with little or no need for them to come back with requests for additional information that could delay approval.

Around 90% of our applications go straight through.

This is down to Alto's experience and expertise in preparing and submitting applications. We know what's required and how to get applications right from the outset, helping to avoid unnecessary delays.

Mitsubishi heat pump undergoing a service from Alto Energy

As the March deadline approaches, this experience will be particularly important. Any delays in the approval process could mean your voucher isn't approved in time, leaving you with the lower £7,500 grant instead.

But we need your help too.

As soon as you place an order with us, our Project Delivery Team will start gathering the information needed for your application. This gives us time to prepare everything properly.

Please keep a close eye on your emails and respond promptly to any requests from our team or Ofgem, both before and during the application process. Getting the information we need quickly will help keep things moving.

If you're unsure about anything, our BUS specialist Eylul is always happy to talk you through it.

There's Another Financial Change Coming: VAT Is Increasing

The BUS grant isn't the only financial incentive with a deadline.

The temporary 0% VAT rate on qualifying heat pump installations is also due to end on 31 March 2027, returning to 5% from 1 April 2027.

If you're thinking about replacing your system, this is another reason not to put things off. Acting sooner could help you benefit from both the higher grant value and the current VAT rate.

Start Planning Your Switch

If you're currently heating your home with oil or LPG, there is a significant financial incentive to make the switch to a heat pump before the March 2027 deadline.

At Alto Energy, we'll help you understand whether your property is suitable for a heat pump, guide you through the application and support you throughout the process, from design and supply through to installation and commissioning.

Get in touch today to discuss replacing your oil or LPG boiler and find out whether you could benefit from the £9,000 grant.